The St. Vincent Ferrer Prayer Park continues to take shape, with the installation of beam support for the main core frame, which paved the way for the installation of the third set of columns for the body of the statue.
The head and hand portions have been reinforced to ensure safety during lifting, while the left and right wings are now being fabricated on-site.
The Prayer Park’s 20-meter wide Main Access Road is undergoing backfilling of soil.